General Information
The Federal Commission of Electricity is responsible for supplying and servicing electricity to the region.

- The distribution line in the region is capable to supply the actual and future needs.
- The connection fee is $ 1,100.00 Mexican pesos ( plus tax)
| Generation plants |
Not available, supplied by the National Transmition Network of 400 kv |
| Supply sources |
Sub-stations of 230 kv
Ramos Potencia-Cedros-Saltillo |
Sub-stations
high-media voltage |
13 sub-stations supplied by the ring of 115 kv with an installed capacity of 535.625 mva |
Sub-stations
media-media voltage |
5 sub-stations with an installed capacity of 13.5 mva |
| Circuits |
55 circuits of 13.8 kv
29 circuits of 34.5 kv |
| Demand |
560 mw of demand system
306 mw of demand media voltage |
| Projections |
For year 2008: substation Morelos (to the west of the city) with a capacity of 30 mva |
SOURCE: FEDERAL COMMISSION OF ELECTRICITY, PLANNING DEPARTAMENT SALTILLO AREA.
| Tariffs |
| Tariff 1 :Domestic service |
| Tariff DAC: High consumption domestic service. |
| Tariff O-M: Ordinary tariff for general service in media voltage, with demand less than 100 kw |
| Tariff H-M: tariff horaria for general service in media voltage with demand of 100 kw or more |
| **Further information on tariffs: http:/www.cfe.gob.mx/es/Informacion AlCliente/conocetutarifa/ |
SOURCE: FEDERAL COMMISSION OF ELECTRICITY, PLANNING DEPARTAMENT SALTILLO AREA.
|