Electricity

General Information
The Federal Commission of Electricity is responsible for supplying and servicing electricity to the region.
cfe logo

  • The distribution line in the region is capable to supply the actual and future needs.
  •  The connection fee is $ 1,100.00 Mexican pesos ( plus tax)
Generation plants Not available, supplied by the National Transmition Network of 400 kv
Supply sources Sub-stations of 230 kv
Ramos Potencia-Cedros-Saltillo
Sub-stations
high-media voltage
13 sub-stations supplied by the ring of 115 kv with an installed capacity of 535.625 mva
Sub-stations
media-media voltage
5 sub-stations with an installed capacity of 13.5 mva
Circuits 55 circuits of 13.8 kv
29 circuits of 34.5 kv
Demand 560 mw of demand system
306 mw of demand media voltage
Projections For year 2008: substation Morelos (to the west of the city) with a capacity of 30 mva


SOURCE: FEDERAL COMMISSION OF ELECTRICITY, PLANNING DEPARTAMENT SALTILLO AREA.

Tariffs
Tariff 1 :Domestic service
Tariff DAC: High consumption domestic service.
Tariff O-M: Ordinary tariff for general service in media voltage, with demand less than 100 kw
Tariff H-M: tariff horaria for general service in media voltage with demand of 100 kw or more
**Further information on tariffs: http:/www.cfe.gob.mx/es/Informacion AlCliente/conocetutarifa/


SOURCE: FEDERAL COMMISSION OF ELECTRICITY, PLANNING DEPARTAMENT SALTILLO AREA.