Water treatment plants in operation

General Cepeda
Name of the plant: General Cepeda
Process: Lodos activados
Installed capacity: 8.00 lts/sec.
Treated flow : 8.00 lts/sec.
Re use: Agriculture
Saltillo
Name of the plant: Saltillo I Club Campestre
Process: Oxidation ditches
Installed capacity: 50 lts/sec
Treated flow : 50 lts/sec
Re-use : Golf course
Name of the plant: Saltillo II AINSA
Process: Lodos activados
Installed capacity: 75 lts/sec
Treated flow: 35 lts/sec
Re use: Industrial /GIS
SOURCE: NATIONAL WATER COMMISION – INFORMATION BY STATE
|