Water treatment plants in operation

General Cepeda
Name of the plant:                            General Cepeda
Process:                                           Lodos activados
Installed capacity:                            8.00 lts/sec.
Treated flow :                                     8.00 lts/sec.
Re use:                                                Agriculture

Saltillo
Name of the plant:                             Saltillo I Club Campestre
Process:                                              Oxidation ditches
Installed capacity:                             50 lts/sec
Treated flow :                                     50 lts/sec
Re-use :                                               Golf course
Name of the plant:                             Saltillo II AINSA
Process:                                               
Lodos activados
Installed capacity:                              75 lts/sec
Treated flow:                                      35  lts/sec
Re use:                                                 Industrial /GIS

SOURCE:  NATIONAL WATER COMMISION – INFORMATION BY STATE

 